During some recent high winds, the table I had built some 8 years ago in my small perm took a hit from some falling branches and needed replacing.
Today, the first free day I have had when it has not pished down or blown a hoolie or both, I went up and built a new table.
I had already cleared the old one away to the fireplace (waste not want not) so all I had to do was cut the timber and tie it in place....
2.5 hours of work, lots of sawing, 300m of paracord substitute and the job was done. Some of the wood was recycled from other projects, some cut just for the table and I reused as much of the cord from the old table as I could - and all because I like a handy table to store stuff, prep food and generally save me from bending too much
became
Today, the first free day I have had when it has not pished down or blown a hoolie or both, I went up and built a new table.
I had already cleared the old one away to the fireplace (waste not want not) so all I had to do was cut the timber and tie it in place....
2.5 hours of work, lots of sawing, 300m of paracord substitute and the job was done. Some of the wood was recycled from other projects, some cut just for the table and I reused as much of the cord from the old table as I could - and all because I like a handy table to store stuff, prep food and generally save me from bending too much
became